Atri Green View



Budget: All Sold Out



Current Status: Completed



Ready in: 2013



Locality / Location : Kumrakhali near E.M. Byepass



Address : 201, Kumrakhali -2, Kolkata



No. of Blocks : 1



Flat Types : 2BHK, 3BHK



No. of Flats : 30 (2BHK:16, 3BHK:14)



Unit Size : 1060-1345 Sqft.

Why To Choose Atri Green View !

 65% Open Space

  World-Class Amenities

 Savings upto 8 Lacs. T & C applicable


  No GST

 A green home project with beautiful natural scenery around

  Location Advantage: Just 5 mins from Bypass


Offer / Schemes


icon

Location

B. D. Memorial School : - 0 mins
Ramkrishna Mission School : - 5 mins
Calcutta International School : - 10 mins
The Heritage School : - 10 mins
Peerless Hospital : - 5 mins
Life Line Nursing Home : - 2 mins
Ruby Hospital : - 15 mins
Fortis : - 16 mins
Big Bazaar : - 5 mins
Garia Market : - 5 mins
Metro Cash & Carry : - 10 mins
Spencers : - 3 mins
Hiland Park & Fame Multiplex : - 5 mins
Garia Railway Station : - 5 mins
Garia Metro Station : - 2 mins
Garia Bus Stand : - 5 mins
Taxi Stand : - 0 mins
Fire Station : - 5 mins

Amenities


Children's Playground

Swimming Pool with Deck - 2 Nos

Senior Citizen Park

Tennis Court



Badminton Court

Toddler's Zone

Landscaped Garden

Maintenance Office



AC Indoor Games Room

AC Gym - 2 Nos.

Yoga Deck

AC Multipurpose Community Hall- 2 Nos.



Jogging & Walking Path

Lily / Lotus Pond

Festival Celebration Desk

TV Satellite Connection



AC Electronic Games Corner

Individual Blocks having Workers' Sitting Area

Intercom

Water Filtration Plant



CCTV in Lobbies

Visitor's Car Parking

Specifications


Structure:
RCC foundation as per Geo-technical Engineer's recommendation

Doors & Windows:
Good quality flush door; Sliding powder coated aluminum windows with white glass panel

Flooring:
Entrance Lobby: Elegantly designed with tiles ; Floor Lobby: Ceramic tiles ; Flat interiors: Vitrified tiles

Walls & Finishing:
Internal: 5"/3" Brick walls with Plaster of Paris finish



Kitchens:
Counter table with Granite top and Stainless steel sink ; Ceramic tiles up to 2ft. above the counter.

Toilets & Fittings:
Floor: Anti skid Ceramic tiles; Wall: Ceramic tiles upto dado height; Concealed hot and cold water pipe system in shower and Basin; Chrome plated Fittings of reputed brand; White Sanitary ware of reputed brand.

Electricals:
Concealed copper wiring with Modular switches ; Adequate light and power points ; Standard main Distribution Box (DB)TV / Telephone points ; AC point in all bedrooms ; Call bell point at entrance of all units.

Water Supply:
24 Hrs Running water with water filtration plant.



Power Backup with Generator:
An uninterrupted power supply

Elevator:
Adequate elevators by reputed makers in each Block

Lobby:
Decorative Lobby

Project Plans

Phase 1

Master Plan for Atri Green Valley Phase 1

Construction Status






Atri Green View



Current Status: Completed

Ready in: 2013

Bank Approvals


icon
icon
icon
icon


Video


No Video Available

Send Enquiry for this Project


CAPTCHA Image Can't read the image? click here to refresh.

You May Also Like

Atri Green Valley

Budget: 23 Lacs - 35 Lacs

Current Status: Ongoing

Ready in: Phase 1 :Completed
Phase 2 :Dec 2018

Location : 5 mins from Bypass,
10 mins from Shahid Khudiram Metro
2BHK, 3BHK Apartments
Total 380 Flats in 19 Blocks

Short Description: Watch for: 65% open space, World-Class Amenities: 2 Swimming pool, 2 ac gym, games room, yoga deck, badminton & tennis courts & more...

View Project Details

Reaching us is Simple !