Atri Green Residency



Budget: 20 Lacs - 26 Lacs



Current Status: Ongoing



Ready in: by Dec, 2017



Locality / Location : 2 mins from NSC Bose Road, 5 mins from Mullickpur Railway Stn. & 8 mins from Shahid Khudiram Metro near Rajpur, Harinavi



Address : 151, Vivekananda Avenue, Kolkata -700145.



No. of Blocks : 3



Flat Types : 2BHK, 3BHK



No. of Flats : 96 (2BHK:60, 3BHK:36)



Unit Size : 840-1120 Sqft.

Why To Choose Atri Green Residency !

 65% Open Space

  World-Class Amenities

 Savings upto 8 Lacs. T & C applicable


  No GST

 A green home project with beautiful natural scenery around

  Location Advantage: Just 5 mins from Bypass


Offer / Schemes


1. Biggest Savings Ever upto 9 Lacs (including benefits under Pradhan Mantri Awas Yojana). T & C Apply.
2. Freedom from GST.. *Grab the opportunity before it's gone*
2. Few Furnished Flats on offer. T & C Apply.
icon

Location

The Project is located at Harinavi, Malancha towards South of Garia and Ramakrishna Mission Narendrapur in Kolkata. It is well connected through bus routes and auto services besides private cabs. The nearest Shahid Khudiram Metro Station is about 10 mins while RKM Narendrapur is barely 5 mins. The Metro links the neighbourhood to any part of the city on the North South Metro running through the CBD areas of Kolkata. All daily necessities, markets etc. are located near Malancha nearly 1 minute's distance from N.S.C. Bose Road. : -

Amenities


Children's Playground

Swimming Pool with Deck - 2 Nos

Senior Citizen Park

Tennis Court



Badminton Court

Toddler's Zone

Landscaped Garden

Maintenance Office



AC Indoor Games Room

AC Gym - 2 Nos.

Yoga Deck

AC Multipurpose Community Hall- 2 Nos.



Jogging & Walking Path

Lily / Lotus Pond

Festival Celebration Desk

TV Satellite Connection



AC Electronic Games Corner

Individual Blocks having Workers' Sitting Area

Intercom

Water Filtration Plant



CCTV in Lobbies

Visitor's Car Parking

Specifications


Structure:
RCC foundation as per Geo-technical Engineer's recommendation

Doors & Windows:
Good quality flush door; Sliding powder coated aluminum windows with white glass panel

Flooring:
Entrance Lobby: Elegantly designed with tiles ; Floor Lobby: Ceramic tiles ; Flat interiors: Vitrified tiles

Walls & Finishing:
Internal: 5"/3" Brick walls with Plaster of Paris finish



Kitchens:
Counter table with Granite top and Stainless steel sink ; Ceramic tiles up to 2ft. above the counter.

Toilets & Fittings:
Floor: Anti skid Ceramic tiles; Wall: Ceramic tiles upto dado height; Concealed hot and cold water pipe system in shower and Basin; Chrome plated Fittings of reputed brand; White Sanitary ware of reputed brand.

Electricals:
Concealed copper wiring with Modular switches ; Adequate light and power points ; Standard main Distribution Box (DB)TV / Telephone points ; AC point in all bedrooms ; Call bell point at entrance of all units.

Water Supply:
24 Hrs Running water with water filtration plant.



Power Backup with Generator:
An uninterrupted power supply

Elevator:
Adequate elevators by reputed makers in each Block

Lobby:
Decorative Lobby

Project Plans

Phase 1

Master Plan for Atri Green Valley Phase 1

Construction Status


  • Main Gate of Atri_Green_Residency
  • Main Gate of Atri_Green_Residency
  • Atri_Green_Residency as on 08.10.17)
  • Atri_Green_Residency as on 08.10.17)
  • Atri_Green_Residency as on 08.10.17)




Atri Green Residency



Current Status: Ongoing

Ready in: by Dec, 2017

Bank Approvals


icon
icon
icon
icon


Video


Send Enquiry for this Project


CAPTCHA Image Can't read the image? click here to refresh.

You May Also Like

Atri Green Enclave

Budget: 20 Lacs - 27 Lacs

Current Status: Ongoing

Ready in: March 2018

Location : Just 2 mins walk from Extended EM Bypass, 8 mins from Shahid Khudiram Metro Station
2BHK, 3BHK Apartments
Total 62 Flats in 2 Blocks

Short Description: Masterfully Designed offering the World’s Best Lifestyle in Living.

View Project Details

Reaching us is Simple !